Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Forklift Petrol / Diesel Work Method Statement
Work Method Statements spacer
d
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Forklift Petrol / Diesel Work Method Statement or Safe Work Procedure


Forklift LPG

Forklift SWMS
Buy Now

 

The Safety Procedure includes:

  • Personal Protective Equipment (PPE)
  • Pre Start Checklists
  • Seat belts
  • General Operation
  • Driving On Roads
  • Re-fueling and Maintenance
  • Risk Ratings
  • MS Word Format
  • This Is Not A Blank Template
  • Delivered via email within 2 business hours

 

 

General Petrol Forklift Safety Information:

Forklift operation can be performed safely with appropriate training and the Fork Lift Safety Procedure or Work Method Statement forms a vital part of any OHS System or Induction.

Forklift Safety Notes

Before Commencing Forklift Work:

Day Operations:
Safety footwear, high visibility shirt or vest, sun protection if required (broad brim hat, sun screen, tinted safety glasses).

Night Operations:
Safety footwear, safety vest or shirt suitable for night work (i.e. with reflective strips).

 


References:

 

 

Queensland – Workplace Health and Safety Regulations 1997 – Schedule 5 – Prescribed Occupations – Part 4 – Forklift Operations
QueenslandDepartment of Industrial Relations – Unit of Competency – OHSCER207A
New South Wales – Occupational Health and Safety Regulations 2001
Victoria - Occupational Health and Safety Regulations 2007
Australian Capital Territory – Work Cover – A guide to forklift safety

 

 




OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012