Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Kitchen Strip Out and Replacement
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Kitchen Strip Out and Replacement Work Method Statement

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Operation
  • Emergency Procedures

Example SWMS
Buy Now

Preperation - Ensure:

  • Power tools are in good condition and power cords are not damaged or have exposed wires
  • Electric leads/extension cords are not placed in areas where they could be damaged, run-over or pose a tripping hazard
  • RCD/safety switches are provided for electrical equipment.
  • Guards in place
  • Blades sharp and free of damage
  • If applicable, oxy-acetylene cylinders are secured, not leaking, undamaged and in good working order. Flashback arrestors installed. MSDS obtained for gases. Welding mask provided with suitable lens filter.

Product Details:

  • 10 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • Instant download delivery

Kitchen Strip Out and Replacement Information:

The Kitchen Strip out and replacement Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure outlining the safety steps for strip out of old kitchens and replacement with new kitchen materials (cabinets, bench-tops, painting, flooring).

The Kitchen Strip out and replacement procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System.

The Kitchen Strip out and replacement procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

References:

  • OHS Legislation in all States
  • WorkSafe Victoria Code of Practice for Manual Handling
  • AS/NZS 1716:2003 Respiratory protective device
  • WorkSafe Victoria – Compliance Code – Removing Asbestos in Workplaces
  • NOHSC:2018 (2005) – Code of Practice for Management and Control of Asbestos in Workplaces
  • Worksafe WA Department of Commerce (2008). Manual Handling and Plumbers (Water, Drainage, Gas, Sanitary and Maintenance)



OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012