Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Knives -safe use
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Knives -safe use Work Method Statement

Knives -safe use Safe Work Method Statement
Example SWMS
Buy Now

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:

  • 9 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related Items:

Knives -safe use Information:

The Knife Safety Safe Work Method Statement (SWMS) is a comprehensive 9 page procedure. This SWMS covers the use of knives (mostly for food-related industries).

This does NOT cover the use of box cutters and blades etc, used to remove packaging materials, or to cut through construction materials, etc.

Most injuries occur to the hand not holding the knife. These are usually caused by errors in judgement when cutting, slipping of hands/knives, or incorrect finger-placement.

The Knife Safety Work Method Statement (WMS) is ready to use and is not a blank template.

Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Knife Safety Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

Operation:

Ensure slicer is cleaned and sanitized as required for food preparation legislation (Example: Every 4 hours of use at room temperature).

Ensure floor area clean and free of slip, trip hazards. Ensure steady balance and firm footing.

Follow manufacturer's instruction for use. Example:

  • Place suitable meat/cheese into position
  • Secure item so it will not shift by using push guard
  • Push product carriage forward and backward over blade using push handle or knob
  • Keep clear of slicer (including handle) when in automatic slicer mode.
  • Turn off and adjust thickness regulator to zero before collecting /removing meat that has been sliced.

Do not work in static postures for 30 minutes at a time, or 2 hours over entire shift. Consider job rotation for long duration slicing tasks.

Keep hands/body parts clear of rotating blades. Do not reach across blade. Always use push guard when slicing.

Turn off whenever leaving slicer (even for a moment).

Ensure full attention when slicing. If interrupted, stop slicing, turn machine off.



OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012