Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Earth Moving >> Ladders
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Engineering
1
1 Concrete Safety
1
Earth Moving
Auger Operation
1
Backhoe or Front End Loader
1
Battery Charging
1
1 1 Bob Cat & Skid Steer
1
1 1 Chain Trencher
1
Demolition Work
1
1 1 Dozer Operations
1
1
1 1 Earth Moving Equipment Maintenance
1
1 1 Excavator Auger Attachment
1
1 1 Excavator - Large
1
1 1 Excavator - Mini
1
1 1 Fuel Storage, Handling and Decanting
1
1 1 Grader
1
1 1 Heat Stress
1
1 1 Hitching Mobile Plant
1
1 1 Incident Report Form
1
1 1 Jack Hammer
1
1 1 Job Safety Analysis Worksheet
1
1 1 Large Excavators
1
1 1 Lock-Out Of Plant And Equipment
1
1 1 Manual Handling
1
1 1 Mini Excavators
1
1 1 Motor Grader Operation
1
1 1 Post Hole Digger
1
1 1 Pressure Cleaner
1
1 1 Ride On Drum Roller
1
1 1 Scraper
1
1 1 Stabiliser RM300 and RM500
1
1 1 Tipping Trucks
1
1 1 Traffic Management Plan
1
1 1 Trench Work
1
1 1 Underground Cable Locating
1
1 1 Vehicle Accident Procedure
1
1 1 Wacker Packer
1
1 1 Water Truck
1
1 1 Working Around Electricity
1
1 1 Complete WMS List
1
1 Industrial Safety
1
1 Electricians
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food And Kitchen Safety
Cleaning Industry
Handyman
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Ladders Work Method Statement

Ladders Safe Work Method Statement
Example SWMS
Buy Now

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Risk Assessment
  • Planning
  • Preparation
  • Pre-Start Checks
  • Ascending and Descending
  • Doing- General
  • Working from
  • References

Product Details:

  • 9 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • Instant download delivery

Related Items:

Ladders Information:

The Ladders Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for use of Portable Ladders.

The major risk with using ladders is falling either from overreaching or the ladder slipping. If the work cannot be performed safely then alternate means should be considered such as mobile or fixed scaffolding, trestles or elevating work platforms “cherry pickers”.

A step ladder should never be 'walked' by the person standing on the ladder. Wooden ladders should never be painted as this will prevent visual inspections to detect deterioration or defects.

The Ladders procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Ladders Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

Preparation

Ladders must be erected on a firm and stable surface.

Wet grass with soft soil beneath it, or a makeshift support under one side is not acceptable.

Ladders must be secured against movement at or near its top or bottom. Example – Being held, tied or clamped to a stable surface.

Stepladders should only be used in the fully open position.



OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012