Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Landscaping & Turf Laying
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Landscaping & Turf Laying Work Method Statement

Landscaping & Turf Laying Safe Work Method Statement
Example SWMS
Buy Now

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Transport of Heavy Equipment
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:

  • 19 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related Items:

Landscaping & Turf Laying Information:

The Landscaping & Turf Laying Safe Work Method Statement (SWMS) is a comprehensive 19 page procedure.

This SWMS covers general aspects associated with landscaping / turf operations. This does not include growing, treatments, fertilizing, using pesticides and collecting turf. Dedicated SWMS must be developed for use of equipment (such as Skid Steer Loader, Tip trucks, Loading/Delivery vehicles etc) and specific tasks.

The Landscaping & Turf Laying procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Landscaping & Turf Laying Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

Planning

Develop plans for project. Include:

  • Layout
  • Maps/drawings
  • Gradients
  • Materials required (amount of turf, bedding, edge restraints, plant, delivery equipment, etc)

Assess intended site. Ensure:

  • Adequate lighting
  • Sufficient room for delivery of materials
  • Located away from potential hazards (hot works such as welding, trenching, spray painting, etc)

Develop traffic management plan if required (ie: working in close proximity to mobile plant, vehicles or roadside work). Include physical barricades, signs, spotters etc. Remain in visual contact with operators of reversing vehicles.

Provide and maintain suitable access/egress for pedestrians where required. Include:

  • Physical barriers to ensure persons do not enter Caution signs, Stop-go baton operators

Ensure workers have access to:

  • First aid kit/supplies
  • Communication devices (check mobile phones will have service in area)
  • Drinking water and toilet facilities
  • PPE required

Current Material Safety Data Sheets (MSDS) are available as needed (pesticides, fertilizers, etc).



OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012