Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Earth Moving >> Large Excavators Work Method Statement
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Engineering
1
1 Concrete Safety
1
Earth Moving
Auger Operation
1
Backhoe or Front End Loader
1
Battery Charging
1
1 1 Bob Cat & Skid Steer
1
1 1 Chain Trencher
1
Demolition Work
1
1 1 Dozer Operations
1
1
1 1 Earth Moving Equipment Maintenance
1
1 1 Excavator Auger Attachment
1
1 1 Excavator - Large
1
1 1 Excavator - Mini
1
1 1 Fuel Storage, Handling and Decanting
1
1 1 Grader
1
1 1 Heat Stress
1
1 1 Hitching Mobile Plant
1
1 1 Incident Report Form
1
1 1 Jack Hammer
1
1 1 Job Safety Analysis Worksheet
1
1 1 Large Excavators
1
1 1 Lock-Out Of Plant And Equipment
1
1 1 Manual Handling
1
1 1 Mini Excavators
1
1 1 Motor Grader Operation
1
1 1 Post Hole Digger
1
1 1 Pressure Cleaner
1
1 1 Ride On Drum Roller
1
1 1 Scraper
1
1 1 Stabiliser RM300 and RM500
1
1 1 Tipping Trucks
1
1 1 Traffic Management Plan
1
1 1 Trench Work
1
1 1 Underground Cable Locating
1
1 1 Vehicle Accident Procedure
1
1 1 Wacker Packer
1
1 1 Water Truck
1
1 1 Working Around Electricity
1
1 1 Complete WMS List
1
1 Industrial Safety
1
1 Electricians
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food And Kitchen Safety
Cleaning Industry
Handyman
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Large Excavators Work Method Statement or Safe Work Procedure


Large Excavator SWMS
Buy Now

 

For information on licensing requirements under the Harmonised WHS Laws, click here.

The Safety Procedure includes:

  • Risk Assessment
  • Being Prepared
  • Pre-start Checks
  • Vehicle Operation
  • Completion
  • Emergency Procedure
  • Risk Ratings
  • MS Word Format
  • Delivered via email within 2 business hours

 

 

General Large Excavator Safety Information:

The Safe Work Procedure outlines the Safety Steps required to operate Large Excavators Safely.

Large Excavators need to be used with caution and appropriate safety procedures. The Large Excavator procedure is Not A Blank Template. Safety Procedures can be edited or customised in MS Word if required.

Large Excavators Safety Notes

Before Operating Large Excavators

  • Check hydraulic hoses and couplings for splits and leaks.
  • Check fluid and oil levels.
  • Familiarise yourself with the controls and safety decal information.
  • Confirm the area is free of personnel.
  • Check all controls for operation direction marking.

References:

 

 

Australia – NTIS – National Training Information Service - BCCPO3003B: Conduct excavator operations
New South Wales – WorkCover – A Guide for Front End Loaders and Excavator Drivers 1994
Tasmania – Magistrates Court - Coronial Findings - Record of Investigation into Death - Rodney James Lindsay
United States - NIOSH (National Institute for Occupational Safety and Health) Publication No. 2004-107: Preventing Injuries When Working with Hydraulic Excavators and Backhoe Loaders
New York State – Department of Health - Fatality Assessment and Control Evaluation - Equipment Operator Killed when Pinned to a Tree by an Excavator (Case Report: 06NY010)
Hong Kong – Labour Department - Code of Practice in the Safe Use of Excavators

 



OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012