|
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Operation
- Cleaning
- Maintenance
- Emergency Response
- References
Product Details:
- 10 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
-
Instant download delivery
Related Items:
|
Line Marking Information:
The Line Marking Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure.
This SWMS concerns the use of walk behind line-marking machines for fields/grassed areas. The EPA states "the use of waste oil [sump oil] for line marking on playing fields is discouraged and all reasonable measures should be used to find a more environmentally benign alternative." The EPA suggests the following: organic-based water soluble paints, water-based vegetable dyes, chalk; and glyphosate-based weed killers".
The Line Marking procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Line Marking Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
Planning:
Inspect intended work area:
- Check for pits, gradients, uneven terrain
- Low lying branches
- Clear stones, sticks, glass or other solid objects from area
Ensure suitable for task (area mowed, no rocky terrain etc)
Obtain current MSDS for chemicals used. Example: calcite, oxides and water-soluble paints used for line marking are mostly hazardous substances.
Ensure:
- Names and quantities of chemicals used are added to the site register
- Risk assessments conducted for storage, use and disposal.
- Minimum quantities stored
- Suitable PPE provided (as per MSDS).
Develop traffic management plan if required (ie: working in close proximity to mobile plant or roadside work)
|