Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> LOTO - Lock Out Tag Out
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

LOTO - Lock Out Tag Out Work Method Statement

LOTO - Lock Out Tag Out Safe Work Method Statement
Example SWMS
Buy Now

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Emergency Procedures
  • References

Product Details:

  • 10 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related Items:

LOTO - Lock Out Tag Out Information:

The Lock Out Tag Out - LOTO Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure.

This SWMS includes general guidance for Locking out and Tagging of plant and machinery to prevent plant and its components from activating (including release of stored energy) during inspection, maintenance, repair or cleaning. It also includes information for tagging plant that is in an unsafe condition.

Without procedures in place to ensure power is isolated to plant, persons can be killed or seriously injured from its accidental start-up.

The LOTO - Lock Out Tag Out procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The LOTO - Lock Out Tag Out Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

Preparation

Ensure appropriate locking devices for type of plant. Examples:

  • Padlocks
  • Lockboxes
  • Lock-out hasps (non-conductive, high visibility – if required)
  • Electrical lockouts
  • Cable lockouts
  • Valve lockouts
  • Safes and key cabinets
  • Ensure suitable tags available:
  • Meet requirements of AS 1319-1994, examples:
  • Out of Service:
    • Yellow background with bold black text "Out of Service" on each side
  • Personal Danger:
    • White background
    • Recognisable danger symbol on each side
    • Bold black text
  • Durable
  • 60 x 120mm
  • Reliable means of attachment

Ensure only 1 key per lock. No duplicate keys.

Ensure ALL employees at site are trained in LOTO procedures



OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012