Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
OHS Systems Work Method
Statements
Safety
Training
OHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Carpentry Industry >> Manual Handling (Lifting) Work Method Statement
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commerical Construction Industry
1
1 Construction Site Safety Management Plans
1
Carpentry Industry
1 1 Docking Saw
1
1 1 Dust Extractor
1
1 1 Jig Saw
1
1 1 Manual Handling (Lifting)
1
1 1 Rip Saw
1
1 1 Spindle Moulder
1
1 1 Staple Gun
1
1 1 Table Planner
1
1 1 Thicknesser
1
1 1 Wide Belt Sander
1
1 Earth Moving
1
1 Electricians
1
1 Industrial Safety
1
1 Engineering
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food And Kitchen Safety
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Manual Handling (Lifting) Safe Work Method Statement or Procedure


Manual Handling - Lifting

Manual Handling - Lifting Safe Work Method Statement
Buy Now

Manual Handling - Lifting Safe Work Method Statement includes :

  • PPE
  • Safety Notes
  • Identify task
  • Assess risk
  • Implement controls
  • Decide on lift type
  • Plan lift
  • Lift procedure
  • Team lift
  • Reporting
  • References
  • 5 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Manual Handling - Lifting Safe Work Method Statement :

The Manual Handling - Lifting Safe Work Method Statement (SWMS) is a comprehensive 5 page procedure outlining the safety steps for Lifting.

This SWMS covers manual handling lifting tasks where :

  • lifting equipment/controls are not practicable.
  • tasks are not undertaken for more than 30 minutes at a time or for 2 hours spread over one shift (eg: long duration).

The Manual Handling - Lifting procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Manual Handling - Lifting procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.




Product Updates: First Name * Last Name * Email *

OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES