Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Earth Moving >> Manual Handling-Lifting
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Engineering
1
1 Concrete Safety
1
Earth Moving
Auger Operation
1
Backhoe or Front End Loader
1
Battery Charging
1
1 1 Bob Cat & Skid Steer
1
1 1 Chain Trencher
1
Demolition Work
1
1 1 Dozer Operations
1
1
1 1 Earth Moving Equipment Maintenance
1
1 1 Excavator Auger Attachment
1
1 1 Excavator - Large
1
1 1 Excavator - Mini
1
1 1 Fuel Storage, Handling and Decanting
1
1 1 Grader
1
1 1 Heat Stress
1
1 1 Hitching Mobile Plant
1
1 1 Incident Report Form
1
1 1 Jack Hammer
1
1 1 Job Safety Analysis Worksheet
1
1 1 Large Excavators
1
1 1 Lock-Out Of Plant And Equipment
1
1 1 Manual Handling
1
1 1 Mini Excavators
1
1 1 Motor Grader Operation
1
1 1 Post Hole Digger
1
1 1 Pressure Cleaner
1
1 1 Ride On Drum Roller
1
1 1 Scraper
1
1 1 Tipping Trucks
1
1 1 Traffic Management Plan
1
1 1 Trench Work
1
1 1 Underground Cable Locating
1
1 1 Vehicle Accident Procedure
1
1 1 Wacker Packer
1
1 1 Water Truck
1
1 1 Working Around Electricity
1
1 1 Complete WMS List
1
1 Industrial Safety
1
1 Electricians
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food And Kitchen Safety
Cleaning Industry
Handyman
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Manual Handling-Lifting Work Method Statement

Manual Handling-Lifting Safe Work Method Statement
Example SWMS
Buy Now

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:

  • 11 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related Items:

Manual Handling-Lifting Information:

The Manual Handling-lifting Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure.

Manual handling includes all physical activity. Manual handling tasks only present a risk when they are considered hazardous. Hazardous manual tasks can lead to injuries that are called “Musculoskeletal Injuries” or MSD’s.

This SWMS covers general aspects associated with hazardous manual handling tasks.

The SWMS covers the requirement to identify, assess and control manual handling risks in relation to lifting tasks across numerous industries including construction, manufacturing, hospitality etc. This does not provide specific risk controls in relation to people-handling in health care settings.

The Manual Handling-lifting Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Manual Handling-lifting Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

Preparation:

Assess specific lifting task. Determine:

  • Suitable access for plant/equipment needed
  • Known hazards at location (eg: asbestos, lead, chemicals, unsafe electrical installations, uneven ground, high traffic or fall risks)
  • Types of objects to be handled/removed
  • Location of objects (eg: third story, no elevator etc)
  • Presence of:
    • Stairs, Slopes/ gradients
    • Pets or children
    • Other potential hazards
  • Loading/transport
    • Ensure vehicle is suitable for loads – trucks, moving vans etc.
    • Where cranes are used, ensure:
      • Dedicated SWMS developed
      • Suitable SWL
      • Licensed operators
      • Sufficient room
      • Traffic Management plan in place
      • Clear of overhead power lines, overhanging trees or other obstructions
      • Lifting equipment (slings, chains, hooks) are suitable SWL, good condition and suitable for type of load
    • Vehicles fitted with hydraulic tailgate Ramps have suitable SWL, attach securely to vehicle
  • Check for hazards associated with controls (traffic management, overhead power lines etc).


OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012