|
Product Details:
- 5 page procedure
- MS Word format NOT PDF
- Add site specific details and risks
-
Instant download delivery
Planning
Assess site. Identify hazards:
- Changes in levels or slopes
- Railings adjacent to edges/drop offs
- Wall or ceiling structures (doorways, bulk heads, etc)
- Floor penetrations, stairwells, windows
- In-built furniture
Note: Do not use where ceiling height is more than 3m.
Develop site specific SWMS.
Ensure rigid mounting/dismounting platform (similar height to stilts) is provided. Persons must not mount/dismount stilts from ground level.
Ensure stilts provided by a recognized industry supplier and manufacturer's instructions are provided.
Ensure stilts are of suitable strength and weight-loading.
|
Plasterer Stilts Information:
The Use of Plasterer Stilts Safe Work Method Statement (SWMS) is a comprehensive 5 page procedure outlining the safety steps for using Plasterer’s Stilts.
Stilts must only be used for short-term work such as installation of insulation/furring channels, patching and stopping of joints using trowels, fixing cornices and minor hand sanding. They are NOT to be used for installation of plaster sheets.
Seek advice from your State for particular risk controls that must be met. The use of Plasterer Stilts is prohibited in NSW.
The Plasterer Stilts procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Use of Plasterer Stilts procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
|