|
The Pool Vacuum includes: - PPE
- Safety Notes
- Planning
- Preparation
- Pre-Operational Inspection
- Operation
- Maintenance
- Emergency Procedures
- References
Product Details: - 10 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Related Products: |
Pool Vacuum Information:
The Pool Vacuum Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure outlining the safety steps for the operation of a pool vacuum for pool cleaning.
The Pool Vacuum Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
This SWMS covers general aspects associated with vacuuming swimming pools. Ensure health guidelines are followed for cleaning intervals and chemical treatments as required.
The Pool Vacuum Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
|
Pre-Operational Inspection:
Conduct visual inspections. Check:
- Safety switch present, tested and functional
- Hoses undamaged, secured, air-tight and free of chemicals
- Suctions, fittings, grills grate covers etc are secured
- All dials and gauges are at correct settings for tasks, visible and functional
- Electrical leads and equipment are free of damage / chemicals and clear of water (including portable equipment such as radios, lights, and extension leads)
- Underwater lighting is free of damage/cracks
- Sufficient hose length
- Pumps, motors etc are guarded to prevent access to danger areas
- Vacuum pole is adjustable, free of damage and chemicals
- Brushes on vacuum head are sufficient length and un-compacted
- Filter is clean and replaced as required
|