Electric High Pressure Water Cleaners can be extremely dangerous and this two page Safe Work Procedure or Work Method Statement is a vital part of a safe work system. SafetyCulture procedures are This Is Not A Blank Template and are not blank templates. Safety Procedures can be edited or customised in MS Word if required.
The Safe Work Procedure Includes:
- Personal Protective Equipment
- Pre Planning
- Operating
- Water Pressure
- Electric Shock
- Trips and Falls
- Completion
- Risk Ratings
|