Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Industrial Safety >> Water Pressure Cleaner Work Method Statement
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Concrete Safety
1
1 Earth Moving
1
1 Electricians
1
1 Engineering
1
Industrial Safety
1
1 1 Air Compressor (Portable)
.
. . Battery Charging
1 1 Brake Press
1
1 1 Cleaning Stainless Steel Weld with pickling gel
1
1 1 Cut off metal saw
1
1 1 DIY Audit Kit
1
1 1 Drill Press
1
1 1 Dust Extractor
1
1 1 Forklift Petrol/Diesel Safety
1
1 1 Forklift Maintenance
1
1 1 Guillotine Use
1
1 1 Grinder (Freehand)
1
1 1 Hydraulic Press
1
1 1 Incident Report
1
1 1 Job Safety Analysis Worksheet
1
1 1 Linisher
1
1 1 LPG Work Method Statement (Liquid Propane Gas)
1
1 1 Manual Handling (Lifting)
1
1 1 Metal turning Lathe
1
1 1 Operating Power Tools
1
1 1 Oxy Acetylene
1
1 1 Pedestal Drill
1
1 1 Permit To Work
1
1 1 Pipe Bender
1
1 1 Plasma Cutter
1
1 1 Powder coating
1
1 1 Pressure Cleaner
1
1 1 Servicing Engines
1
1 1 Sheet Metal Roller
1
1 1 Steel Construction
1
1 1 Trucks (Loading/Unloading)
1
1 1 Welder (Electric)
1
1 1 Welder Mig
1
1 1 Welder Tig
1
1 1 Working Around Electricity
1
1 1 Complete WMS List
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Welding Industry
1
1 Welding Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food and Kitchen Safety
Cleaning Industry
Handyman
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs
d

Water Pressure Cleaner Work Method Statement or Safe Work Procedure

 

Electric High Pressure Water Cleaners can be extremely dangerous and this two page Safe Work Procedure or Work Method Statement is a vital part of a safe work system. SafetyCulture procedures are This Is Not A Blank Template and are not blank templates. Safety Procedures can be edited or customised in MS Word if required.

The Safe Work Procedure Includes:

  • Personal Protective Equipment
  • Pre Planning
  • Operating
  • Water Pressure
  • Electric Shock
  • Trips and Falls
  • Completion
  • Risk Ratings

 

SWP_Sample

Back      Buy Now $79.95 plus GST

  • 2 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

Pressure Cleaner Safety Notes

Before Using Pressure Cleaners:

Ensure:

  • Position the cleaner as close as possible to the water supply.
  • Connect the electric lead to a safety switch.
  • Ensure that the electric lead will be away from the area to be cleaned.
  • Connect the water hose and check that it is secure.
  • Connect the high pressure hose and gun.
  • Check the operation of the gun safety switch and trigger.
  • Check the distance that can be covered before the cleaner will need repositioning.
Pressure_Cleaner_Safety

 

High_Pressure_Safety

 

When Using A Pressure Cleaner

  • Operate the gun safety switch and trigger so that water runs out of the nozzle.
  • Direct the water away from the cleaner and turn on the power switch
  • Direct spray onto the work area.
  • Remember that the pressure can be reduced by simply moving the nozzle further away from the work.

To Purchase The Complete Safe Work Procedure For Pressure Cleaners Choose The By Now Option Below.


 




OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012