Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Removalist
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Removalist Work Method Statement

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Transport
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Example SWMS
Buy Now

Product Details:

  • 12 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related Items:

Removalist Information:

The Removalist Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure. This SWMS covers removal of heavy items such as furniture from residential and commercial premises. This SWMS should be used in conjunction with the Manual Handling Training Module for Furniture removal and other SWMS as relevant (cranes, confined space entry etc).

The Removalist Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Removalist Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

Planning:

Liaise with client before arrival. Determine:

  • Suitable access for plant/equipment needed
  • Parking availability
  • Type of location (e.g. residential, manufacturing plant)
  • Known hazards at location (e.g. asbestos, lead, chemicals, unsafe electrical installations, uneven ground, high traffic or fall risks)
  • Types of objects to be handled/removed
  • Location of objects (e.g. third story, no elevator etc)
  • Presence of:
    • Stairs
    • Slopes/ gradients
    • Pets or children, Other potential hazards

Inspect site upon arrival. Check:

  • Presence of hazardous materials such as asbestos, lead, etc)
  • Load bearing capacity of support walls, ceiling, roof (if required to enter roof areas)
  • Height of work area
  • Access for equipment (including height access equipment) and materials
  • Power supply (if needed)
  • Location of existing services (overhead power lines heating, electrical leads, gas tanks etc)
  • Vehicle access
  • Traffic Management
  • Weather conditions (excessive wind/rain)
  • Lighting (consider extreme changes from interior to exterior during removals)



OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012