Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Rigging Work Method Statement
Work Method Statements spacer
d
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Rigging Work Method Statement or Safe Work Procedure


Rigging Safety

Rigging SWMS
Buy Now

 

The Safety Procedure includes:

  • Risk Assessment
  • Site Awareness
  • Operators Requirements
  • Personal Protective Equipment
  • Pre-Start Checks
  • Dogman Instructions
  • Eye bolts, Slings
  • Weights
  • Risk Ratings
  • And much more
  • 5 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

 

 

General Rigging Safety Information:

The Rigging Safety Procedure has been developed for employers to implement a site and company safety procedure for employees and contractors to perform Rigging tasks safely.

The document can be used as part of a Safety Induction or simply implemented into an existing OHS System.

Before Lifting:

  • Inspect harness for damage
  • Inspect and insure correct operation of inertia reel.   
  • Check that the anchor point or static line are correctly located and have not been damaged.
  • Ensure that the harness is correctly fitted, adjusted and connected to anchor point or static line.

Rigging With Chains

Check for damage such as:

  • Stretching or bending of links
  • Small dents on the surface of links
  • Wear on parts of the links that seat each other
  • Deformation
  • Rust, nicks or gouges, pitting or corrosion and
  • Links that are locked or without free movement.

References:

Queensland - Workplace Health and Safety Regulation 1997 - Schedule 5 Prescribed occupations
New South Wales – WorkCover - Occupational Health and Safety Regulation 2001
New South Wales - WorkCover– Rigging- National Certificate of Competency
Victoria - Occupational Health and Safety (Certification of Plant Users and Operators) Regulations 1994
Canadian Centre for Occupational Health and Safety – Lifting with Eye Bolts
SafetyCulture – Safe Work Procedures – Safety Harnesses – Scaffolding – Ladders (Safe use of) -

 


OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012