Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Industrial Safety >> Rigging Work Method Statement
Work Method Statements spacer
d
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Concrete Safety
1
1 Earth Moving
1
1 Electricians
1
1 Engineering
1
Industrial Safety
1
1 1 Air Compressor (Portable)
.
. . Battery Charging
1 1 Brake Press
1
1 1 Cleaning Stainless Steel Weld with pickling gel
1
1 1 Cut off metal saw
1
1 1 DIY Audit Kit
1
1 1 Drill Press
1
1 1 Dust Extractor
1
1 1 Forklift Petrol/Diesel Safety
1
1 1 Forklift Maintenance
1
1 1 Guillotine Use
1
1 1 Grinder (Freehand)
1
1 1 Hydraulic Press
1
1 1 Incident Report
1
1 1 Job Safety Analysis Worksheet
1
1 1 Linisher
1
1 1 LPG Work Method Statement (Liquid Propane Gas)
1
1 1 Manual Handling (Lifting)
1
1 1 Metal turning Lathe
1
1 1 Operating Power Tools
1
1 1 Oxy Acetylene
1
1 1 Pedestal Drill
1
1 1 Permit To Work
1
1 1 Pipe Bender
1
1 1 Plasma Cutter
1
1 1 Powder coating
1
1 1 Pressure Cleaner
1
1 1 Servicing Engines
1
1 1 Sheet Metal Roller
1
1 1 Steel Construction
1
1 1 Trucks (Loading/Unloading)
1
1 1 Welder (Electric)
1
1 1 Welder Mig
1
1 1 Welder Tig
1
1 1 Working Around Electricity
1
1 1 Complete WMS List
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Welding Industry
1
1 Welding Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food and Kitchen Safety
Cleaning Industry
Handyman
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Rigging Work Method Statement or Safe Work Procedure


Rigging Safety

Rigging SWMS
Buy Now

 

The Safety Procedure includes:

  • Risk Assessment
  • Site Awareness
  • Operators Requirements
  • Personal Protective Equipment
  • Pre-Start Checks
  • Dogman Instructions
  • Eye bolts, Slings
  • Weights
  • Risk Ratings
  • And much more
  • 5 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

 

 

General Rigging Safety Information:

The Rigging Safety Procedure has been developed for employers to implement a site and company safety procedure for employees and contractors to perform Rigging tasks safely.

The document can be used as part of a Safety Induction or simply implemented into an existing OHS System.

Before Lifting:

  • Inspect harness for damage
  • Inspect and insure correct operation of inertia reel.   
  • Check that the anchor point or static line are correctly located and have not been damaged.
  • Ensure that the harness is correctly fitted, adjusted and connected to anchor point or static line.

Rigging With Chains

Check for damage such as:

  • Stretching or bending of links
  • Small dents on the surface of links
  • Wear on parts of the links that seat each other
  • Deformation
  • Rust, nicks or gouges, pitting or corrosion and
  • Links that are locked or without free movement.

References:

Queensland - Workplace Health and Safety Regulation 1997 - Schedule 5 Prescribed occupations
New South Wales – WorkCover - Occupational Health and Safety Regulation 2001
New South Wales - WorkCover– Rigging- National Certificate of Competency
Victoria - Occupational Health and Safety (Certification of Plant Users and Operators) Regulations 1994
Canadian Centre for Occupational Health and Safety – Lifting with Eye Bolts
SafetyCulture – Safe Work Procedures – Safety Harnesses – Scaffolding – Ladders (Safe use of) -

 


OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012