Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Rubbish Removal Work Method Statement
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Rubbish Removal Work Method Statement or Safe Work Procedure


Rubbish Removal

Rubbish Removal Safe Work Method Statement
Buy Now

The Rubbish Removal Safety Procedure includes :

  • PPE
  • Safety Notes
  • Planning and Preparation
  • Collection
  • Transport
  • Unloading at Landfill
  • Clean Up
  • Emergency Procedures
  • References
  • 4 page procedure
  • E-mailed out
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Rubbish Removal Safe Work Method Statement:

The Rubbish Removal Safe Work Method Statement (SWMS) is a comprehensive 4 page procedure outlining the safety steps for the collection and disposal of rubbish. This SWMS does not include bulk collection (such as residential curb-side collection), asbestos waste, dangerous goods/hazardous substance disposal, radioactive, biological, medical or bulk green waste.

The Rubbish Removal procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Rubbish Removal procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

  • Be aware of mobile plant in operation
  • Wear high visibility clothing (if required), safety boots and safety glasses (especially if windy).
  • Park vehicle in safe manner. Check for vehicles before exiting.
  • Release ties slowly and remove tarp.
  • Do not stand on or enter tray/trailer.
  • Use push sticks/tools to remove bags.




  • OHS Systems

    OHS System - General
    Construction OHS
    OHS System Audit
    Transport Safety
    OHS Diary
    OHS Equipment Registers
    JSA Template
    Incident Report Forms
    Construction Site Sole Trader
    Industrial Sole Trader Pack
    Environmental Management Plan (EMP)
    Work Method Statements (WMS)

    Construction WMS
    Residential Construction
    Construction Site Safety Plans
    Engineering WMS
    General Safe Work Procedures
    Earthmoving WMS
    Custom Safe WMS
    Complete WMS List
    How to develop a WMS
    Free Sample WMS
    Safety Training

    Online OHS Induction Courses
    Safety DVD's
    OHS Consultants
    Safety Induction
    OHS News
    Toolbox Talks Resources
    BetaGuard Mobile Scaffold
    OHS Auditing

    Free Audit Templates
    On Site OHS Audits
    OHS Consulting
    Safety Audit
    Equipment Safety Audit
    Construction Site Audits
    First Aid Kits

    Portable First Aid Kits
    Softpack First Aid Kits
    Wallmounted First Aid Kits
    High Risk Risk First Aid Kits
    Mining Industry First Aid Kits
    Construction First Aid Kits
    National First Aid Kits

     

    ABOUT SSL CERTIFICATES
    National Safety Council of Australia (NSCA) Member 2012