Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Scaffolding Work Method Statement
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Scaffolding Work Method Statement or Safe Work Procedure


Scaffolding

Scaffolding SWMS
Buy Now

 

The Safety Procedure includes:

  • Personnel Requirements
  • Risk Controls
  • Transporting
  • Site Awareness
  • Planning
  • Erection Safety
  • Pre-Start Checks General
  • Pre-Start Checks Ladder
  • Working On Scaffolding
  • Risk Ratings
  • and more...
  • 3 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

 

 

General Scaffolding Safety Information:

The three page Safe Work Method Statement outlines the Safety Steps required to Safely use Scaffolding.

Scaffolding needs to be used with caution and appropiate safety procedures. The Scaffolding procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

Scaffolding Safety Notes

When Working With Scaffolding:

  • If the scaffolding is incomplete, barricades, danger tags or warning signs should be used to prevent unauthorised access.
  • Team lifting is not a preferred method for load handling and should only be used as a last resort.
  • Scaffolding foundations MUST be able to carry and distribute all the weight of the scaffold, including any extra loads.

References:

 

 

Queensland – Department of Industrial Relations – Scaffolding Advisory Standard 2004.
ACT – WorkCover – A Guide to Scaffolding Safety 2006.
Victoria - WorkSafe - Guidance Note – Fall Prevention for Scaffolders.
New South Wales – WorkCover – The Requirements for Scaffolding in NSW – Policy Statement. May 2004.
New South Wales – Occupational Health and Safety Regulations 2001.
SAI Global – AS/NZS 1576.3:1995 Prefabricated and tube-and-coupler scaffolding.
SAI Global – AS/NZS - 1576.1:1995 Scaffolding Part 1: General Requirements.

 



OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012