Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
OHS Systems Work Method
Statements
Safety
Training
OHS AuditsSafety ShopOHS News
nav spacer
Work Method Statements
Work Method Statements spacer
Safety Culture >> Work Method Statements >> Industrial Safety >> Scaffolding Work Method Statement
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Concrete Safety
1
1 Earth Moving
1
1 Electricians
1
1 Engineering
1
Industrial Safety
1
1 1 Air Compressor (Portable)
.
. . Battery Charging
1 1 Brake Press
1
1 1 Cleaning Stainless Steel Weld with pickling gel
1
1 1 Cut off metal saw
1
1 1 DIY Audit Kit
1
1 1 Drill Press
1
1 1 Dust Extractor
1
1 1 Forklift Petrol/Diesel Safety
1
1 1 Forklift Maintenance
1
1 1 Guillotine Use
1
1 1 Grinder (Freehand)
1
1 1 Hydraulic Press
1
1 1 Incident Report
1
1 1 Job Safety Analysis Worksheet
1
1 1 Linisher
1
1 1 LPG Work Method Statement (Liquid Propane Gas)
1
1 1 Manual Handling (Lifting)
1
1 1 Metal turning Lathe
1
1 1 Operating Power Tools
1
1 1 Oxy Acetylene
1
1 1 Pedestal Drill
1
1 1 Permit To Work
1
1 1 Pipe Bender
1
1 1 Plasma Cutter
1
1 1 Powder coating
1
1 1 Pressure Cleaner
1
1 1 Servicing Engines
1
1 1 Sheet Metal Roller
1
1 1 Steel Construction
1
1 1 Trucks (Loading/Unloading)
1
1 1 Welder (Electric)
1
1 1 Welder Mig
1
1 1 Welder Tig
1
1 1 Working Around Electricity
1
1 1 Complete WMS List
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Welding Industry
1
1 Welding Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food and Kitchen Safety
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Scaffolding Work Method Statement or Safe Work Procedure


Scaffolding

Scaffolding SWMS
Buy Now

 

The Safety Procedure includes:

  • Personnel Requirements
  • Risk Controls
  • Transporting
  • Site Awareness
  • Planning
  • Erection Safety
  • Pre-Start Checks General
  • Pre-Start Checks Ladder
  • Working On Scaffolding
  • Risk Ratings
  • and more...
  • 3 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

 

 

General Scaffolding Safety Information:

The three page Safe Work Method Statement outlines the Safety Steps required to Safely use Scaffolding.

Scaffolding needs to be used with caution and appropiate safety procedures. The Scaffolding procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

Scaffolding Safety Notes

When Working With Scaffolding:

  • If the scaffolding is incomplete, barricades, danger tags or warning signs should be used to prevent unauthorised access.
  • Team lifting is not a preferred method for load handling and should only be used as a last resort.
  • Scaffolding foundations MUST be able to carry and distribute all the weight of the scaffold, including any extra loads.

References:

 

 

Queensland – Department of Industrial Relations – Scaffolding Advisory Standard 2004.
ACT – WorkCover – A Guide to Scaffolding Safety 2006.
Victoria - WorkSafe - Guidance Note – Fall Prevention for Scaffolders.
New South Wales – WorkCover – The Requirements for Scaffolding in NSW – Policy Statement. May 2004.
New South Wales – Occupational Health and Safety Regulations 2001.
SAI Global – AS/NZS 1576.3:1995 Prefabricated and tube-and-coupler scaffolding.
SAI Global – AS/NZS - 1576.1:1995 Scaffolding Part 1: General Requirements.

 


Product Updates: First Name * Last Name * Email *

OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES