Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Garden Contractors >> Knives Work Method Statement
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Concrete Safety
1
1 Earth Moving
1
1 Engineering
1
1 Industrial Safety
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Electricians
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Welding Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
Garden Contractors
1 1 Backhoe or Front End Loader
1
1 1 Bark Blower
1
1 1 Bite and Sting Prevention
1
1 1 Bobcat Operation
1
1 1 Brush Cutter
1
1 1 Chainsaw Operation
1
1 1 Chain Trencher
1
1 1 Chemical Loading on to Vehicle
1
1 1 Complete OHS For Garden Maintanence
1
1 1 Fuel Storage, Handling & Decanting
1
1 1 Hedge Trimmer
1
1 1 Hitching Mobile Plant to Vehicle
1
1 1 Incident Report
1
1 1 Job Safety Analysis Worksheet
1
1 1 Lawn Edger (Handheld)
1
1 1 Lawn Mower (General)
1
1 1 Lawn Mower - Ride On - Mid Mount
1
1 1 Lawn Mower - Ride On - Front Mount
1
1 1 Manual Handling (Lifting)
1
1 1 Mini Excavator
1
1 1 Operating Power Tools
1
1 1 Permit To Work
1
1 1 Rubbish Removal
1
1 1 Stump Grinding
1
1 1 Tractor Slashing
1
1 1 Trucks (Loading/Unloading)
1
1 1 Treated Timber
1
1 1 Vehicle Accident Procedure
1
1 1 Weed Control Using Herbicides
1
1 1 Wood Chipper
1
1 1 Complete WMS List
1
1 Food And Kitchen Safety
Cleaning Industry
Handyman
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Knives Work Method Statement or Safe Work Procedure

Safety Culture - Knives
Knives SWMS
Buy Now

 

The Safety Procedure includes:

  • Operators Requirements
  • Planning
  • Site Layout - Indoors
  • Preparation
  • Pre-Start Checks
  • Doing
  • On Completion
  • First Aid
  • Risk Ratings
  • 4 Page Complete Procedure
  • MS Word Format
  • Ready To Use
  • Version 4.0

 

 

General Knives Safety Information:

The four page Safe Work Method Statement outlines the Safety Steps required to Safely use Knives.

Knives need to be used with caution and appropiate safety procedures. The Kinves procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

Knives Safety Notes

When Using Knives:

  • Do not allow employees to bring their own knives to work.
  • For kitchen type work use quality forged, well balanced knives.
  • Confirm suitable belts/sheaths are supplied for employees who need to move around with knives. Example – Butchers
  • The floor area is to be kept clean and clear of spills.


OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012