Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Sharps Disposal Work Method Statement
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Sharps Disposal


Sharps Disposal

Sharps Disposal SWMS
Buy Now

 

The Sharps Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Operation
  • References
  • 4 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • E-mailed out

 

General Sharps Disposal Safety Information:

The Sharps Disposal Safe Work Method Statement (SWMS) is a comprehensive 4 page procedure outlining the steps for the safe disposal of sharps.

Sharps can include hypodermic and suture needles, intravenous blood collection devices, phlebotomy devices and scalpels. Most sharps injuries occur when disposing sharps (unsuitable container design/location, recapping before disposal, and over filling disposal containers).

The Sharps Disposal procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Sharps Disposal procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Sharps Disposal Safety Notes

When Disposing Sharps:

  • Tell people not to approach the immediate area.
  • Obtain a sharps container.
  • Do NOT attempt to recap any needles.
  • Small containers are to be used only once.
  • Do not hold the container while trying to dispose the needle.

References

  • OHS/Department of Health Legislation in all States
  • AS4031 – 1992 Non-reusable containers for the collection of sharp medical items used in health care areas
  • AS/NZS 2243 Set – 2006 Safety in Laboratories
  • CDC 2008 Workbook for designing, implementing, evaluating a sharps injury prevention program
  • QLD Government – QLD Health – Standard Precautions
  • NIOSH 1998 Selecting, Evaluating and Using Sharps Disposal containers


OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012