Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Sheet Metal Roller Work Method Statement
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Sheet Metal Roller Work Method Statement or Safe Work Procedure


Sheet Metal Roller

Sheet Metal Roller Safe Work Method Statement
Buy Now

Sheet Metal Roller Safe Work Method Statement includes:

  • PPE
  • Safety Notes
  • Planning
  • Pre- operational checks
  • Operation
  • Clean up & maintenance
  • Emergency procedures
  • References
  • 5 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Sheet Metal Roller Safe Work Method Statement:

The Sheet Metal Roller Safe Work Method Statement (SWMS) is a comprehensive 5 page procedure outlining the safety steps for using a Sheet Metal Roller.

The Sheet Metal Roller procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Sheet Metal Roller procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Clean up & maintenance :

  • Switch off the machine and remove power supply (isolate from power).
  • Clean work area (Use gloves to handle scrap).

Note : Sheet metal edges are sharp.

  • Inspect for damage. If damaged, tag out plant and report immediately.
  • Follow manufacturer’s instructions for regular maintenance and servicing.
  • Ensure any guards removed during maintenance are replaced and secured.

References

OHS Legislation in all States

National Standard for Plant [NOHSC:1010(1994)]

Worksafe Victoria - Code of Practice for Plant

DEIR Queensland – Product Manufacturing Industry – Sheet Metal/Plate Rolling Machines, 2003

Worksafe Victoria – A Guide to Safety in the Metal Fabrication Industry 2007.

Australian Standards 4024-1998 Series – Safeguarding of Machinery

  • air temperature
  • humidity
  • radiant heat (sun, furnaces etc)
  • air movement/wind speed
  • workload (nature and duration)
  • physical capability of worker (acclimatisation, weight, fitness level, medications, existing medical conditions)
  • clothing and PPE required
-->




OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012