|
Product Details:
- 12 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
-
Instant download delivery
Related Items:
|
Shower Screen Installation Information:
The Shower Screen Installation Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure. This SWMS covers general safety issues associated with installation of shower screens and large mirrors. This does not include cutting these materials to size.
The Shower Screen Installation procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Shower Screen Installation Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
Pre-operational Inspection:
Ensure:
- PPE supplied as needed and in good condition
- Tools are visually inspected for any damage
- Free of oil, grease, debris vents; filters etc clear and free of dust/debris
- Outside casing not damaged
- Fans and cooling devices functional
- Attachments secured and suitable for tool
- Tools are not modified
- Locking pins in place
- No loose or missing screws, nuts, bolts
- Blades sharp, chains tights
- Guards prevent access to danger areas
- Locking devices functional
- Triggers do not stick or are faulty
- Wood dust collection bags in place
- Battery charging areas well ventilated
- Batteries fully charged
- No air/fluid leaks
- Locking pins, modifications, additions and attachments are approved by the manufacturer.
Ensure all electrical leads and equipment are:
- Undamaged (inspect entire length of lead and plug)
- Tested and tagged
- Safety switches (RCD's) used
If any equipment is damaged or unsuitable for the task do not use. Take out of service immediately and apply LOTE (Lock-Out / Tag-Out) procedures.
|