Stairs Handrails & Balusters Information:
The Stairs Handrails & Balusters Safe Work Method Statement (SWMS) is a comprehensive 9 page procedure outlining the safety steps for installing stairs, handrails and balusters.
Critical Information: Reference must be made to Material Safety Data Sheets (MSDS) or Technical Data Sheets (TDS) for information relating to specific hazards and risk control measures associated with various timbers / wood products – In particular the use of Medium Density Fibre-board (MDF).All appropriate Personal Protective Equipment (PPE) must be available, suitable and worn when carrying out work activities. All employees (including sub contractors) must comply with additional health and safety conditions imposed by the Builder / Site. Appropriate job planning, acceptable housekeeping standards & working harmoniously with other trades (persons) is expected
The Stairs Handrails & Balusters procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Stairs Handrails & Balusters Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
Transporting
Ensure an appropriate number of people are assigned to load vehicle to reduce manual handling risks. Ensure that materials / equipment are suitably restrained during transport to prevent damage and or load moving / being lost. Check integrity of load restraint prior to leaving site. Ensure load does not restrict view of vehicle driver.
|