Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
OHS Systems Work Method
Statements
Safety
Training
OHS AuditsSafety ShopOHS News
nav spacer
Work Method Statements
Work Method Statements spacer
Safety Culture >> Work Method Statements >> Industrial Safety >> Steel Construction Work Method Statement
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Concrete Safety
1
1 Earth Moving
1
1 Electricians
1
1 Engineering
1
Industrial Safety
1
1 1 Air Compressor (Portable)
.
. . Battery Charging
1 1 Brake Press
1
1 1 Cleaning Stainless Steel Weld with pickling gel
1
1 1 Cut off metal saw
1
1 1 DIY Audit Kit
1
1 1 Drill Press
1
1 1 Dust Extractor
1
1 1 Forklift Petrol/Diesel Safety
1
1 1 Forklift Maintenance
1
1 1 Guillotine Use
1
1 1 Grinder (Freehand)
1
1 1 Hydraulic Press
1
1 1 Incident Report
1
1 1 Job Safety Analysis Worksheet
1
1 1 Linisher
1
1 1 LPG Work Method Statement (Liquid Propane Gas)
1
1 1 Manual Handling (Lifting)
1
1 1 Metal turning Lathe
1
1 1 Operating Power Tools
1
1 1 Oxy Acetylene
1
1 1 Pedestal Drill
1
1 1 Permit To Work
1
1 1 Pipe Bender
1
1 1 Plasma Cutter
1
1 1 Powder coating
1
1 1 Pressure Cleaner
1
1 1 Servicing Engines
1
1 1 Sheet Metal Roller
1
1 1 Steel Construction
1
1 1 Trucks (Loading/Unloading)
1
1 1 Welder (Electric)
1
1 1 Welder Mig
1
1 1 Welder Tig
1
1 1 Working Around Electricity
1
1 1 Complete WMS List
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Welding Industry
1
1 Welding Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food and Kitchen Safety
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Steel Construction Work Method Statement or Safe Work Procedure


Steel Construction

Steel Construction SWMS
Buy Now

 

The Steel Construction Safety Procedure includes :

  • PPE
  • Safety Notes
  • Personnel
  • Planning
  • Site Assessment
  • Transport
  • Erection
  • Lifting
  • Emergency Procedures
  • References
  • 9 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

 

 

Steel Construction Safe Work Method Statement:

The Steel Construction Safe Work Method Statement (SWMS) is a comprehensive 9 page procedure outlining the safety steps for Steel Construction. Steel construction involves erection of assembled portions and single components including columns, beams, bracing, rafters etc.

The Steel Construction procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Steel Construction procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.


References:

NSW-    Occupational Health and Safety Act 2000
            Occupational Health and Safety Regulation 2001

QLD-    Workplace Health and Safety Act 1995 (Reprinted 1/1/08)
            Workplace Health and Safety Regulation (Reprinted 1/2/08)
            Steel Construction Code of Practice 2004

ACT-     Occupational Health and Safety Act 1989
            Code of Practice Steel Construction 1997

TAS-     Workplace Health and Safety Act 1995
             Workplace Health and Safety Regulation 1998

NT-       Workplace Health and Safety Act 2007
             Workplace Health and Safety Regulation 2008

SA-       Occupational Health, Safety and Welfare Act 1986
            Occupational Health Safety and Welfare Regulation 1995

WA-      Occupational Safety and Health Act 1984

 

 

 

 

 

 

 

 


Product Updates: First Name * Last Name * Email *

OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES