|
Preparation for Travel:
- Ensure operator is not under influence of drugs/alcohol or fatigued.
- Note: State road rules apply during operation of vehicle.
- Conduct visual check around vehicle before driving. Use spotters where required
- Use hand-hold and steps when entering/exiting cabin. Do not jump from cabin.
- Ensure seatbelt is worn
- Adjust mirrors/reversing camera
- Ensure vehicle is secured for travel (brooms in upright position, discharge door secured etc)
Product Details:
- 10 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- Instant download delivery
|
Street Sweeper Information:
The Street Sweeper Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure outlining the safety steps for using a Street Sweeper.
This SWMS covers mechanically-powered, regenerative air street sweepers.
The Street Sweeper procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Street Sweeper Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
References:
- OHS Legislation in all States
- WorkSafe Victoria (2008) Waste Collection – Reducing risks of people being struck by
reversing vehicles
- Schwarze Sweeping Changes in Oz – a5500 Series Sweeper
Specifications
- WorkSafe Victoria (2008) Prevention of falls in the
transport of waste and recyclables
- NATIONAL STANDARD FOR PLANT [NOHSC:1010]
- QLD Code of Practice
for Plant
- WA Code of Practice for Plant in the Workplace
- Victoria Code of Practice for Plant
|