The Safety Procedure includes:
- Risk Assessment
- Being Prepared
- Pre-start Checks
- Operating
- Completion
- Transporting
- Emergencies
- Risk Ratings
- 4 Page Complete Procedure
- MS Word Format
- This Is Not A Blank Template
- Version 4.0
|
General Stump Grinder Safety Information:
The seven page Safe Work Procedure outlines the Safety Steps required to operate Stump Grinders Safely.
Stump Grinders need to be used with caution and appropiate safety procedures. The Stump Grinder procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
Stump Grinder Safety Notes
Before Operating Stump Grinders:
- Review all safety decals.
- Confirm all the guards are in place in good condition.
- Make sure the engine is stopped before refueling.
- If there is a leak in the fuel system the engine must not be started until resolved.
- The break is in lock position.
|