Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Timber Floor Sanding & Polishing
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Timber Floor Sanding & Polishing Work Method Statement

Timber Floor Sanding & Polishing Safe Work Method Statement
Example SWMS
Buy Now

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:

  • 15 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related Items:

Timber Floor Sanding & Polishing Information:

The Timber Floor Sanding & Polishing Safe Work Method Statement (SWMS) is a comprehensive 15 page procedure. This SWMS involves the use of a floor sander on indoor timber floor then polishing using varnish or similar floor coating.

The Timber Floor Sanding & Polishing procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Timber Floor Sanding & Polishing Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

Preparation

Storing Coating:

  • Ensure packages are stored within manufacturer’s recommendations (example: between 5-35OC)
  • Ensure adequate spill containment is provided (eg: Bunded Pallets for packages if required)
  • Out of direct sunlight. Do not allow temperature to exceed 49 degrees.
  • Store away from ignition sources
  • Store clear of incompatibles (such as strong acids, oxidisers, aluminium and copper alloys
  • Ensure spill containment kit available at site:
    • Non-combustible absorbent materials
    • Non-sparking tools

Remove all furnishings, floor hardware, curtains, items in cabinets etc. Cover items that cannot be removed with plastic and duct tape.

Seal all voids with heavy plastic and duct tape. Include:

  • Windows
  • Doors
  • Air conditioning cooling and heating vents

Prepare floor.

  • Ensure nails are punched at least 3mm below surface of boards
  • Holes filled with timber putty and allowed to dry
  • Cleaned free of dirt, grease, debris or flammable materials such as oil and thinners.

Provide mechanical extraction for dust control as needed.



OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012