|
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Pre-operational Inspection
- Attachments
- Operation
- Completion
- Maintenance
- Emergency Procedures
- References
Product Details:
- 13 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
-
Instant download delivery
Related Items:
|
Tractor Information:
The Tractor Safe Work Method Statement (SWMS) is a comprehensive 13 page procedure. This SWMS covers the operation of tractors. This does NOT include stationary tractors used as pumps etc, or tractors under 560kgs.
The Tractor procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Tractor Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
Planning
Ensure tractor size/capabilities sufficient for task.
Ensure tractor has a Roll Over Protection Structure (ROPS) fitted. If tractor is used for tasks where materials could fall onto cabin, fit Falling Object Protective Structures (FOPS). These must meet relevant AS
If tractor will be used on public roads, ensure:
- Registered and roadworthy
- Reflectors, rear view mirror, audible horn, head, tail, brake and signal lights installed.
Inspect intended travel paths. Plan route to eliminate danger areas, such as:
- Rocky areas / Steep slopes
- River /creek crossings
- Close proximity to roadside
- Cliffs, pits, trenches, ponds, drop-offs etc.
- Long grass that could hide stumps, root systems, animal burrows, fencing etc)
Establish "no go zones" for dangerous areas or tasks that exceed manufacturer’s recommendations.
Plan a communication system for working alone. Ensure supervisor notified of leaving time, the intended work route and the expected return time. Provide reliable communication devices. Ensure mobile phone has service.
Ensure first aid kit and fire extinguisher provided on tractor.
|