Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Tree Felling Work Method Statement
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Tree Felling Work Method Statement or Safe Work Procedure


Tree Felling

Tree Felling SWMS
Buy Now

 

The Safety Procedure includes:

  • Risk Assessment
  • Chainsaws
  • Climbing Trees
  • Ladders
  • EWP's
  • Using Tools in Trees
  • Felling Trees
  • Waste Removal
  • Emergencies
  • Risk Ratings
  • 10 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

 

 

General Tree Felling Safety Information:

The ten page Safe Work Procedure outlines the Safety Steps required when Tree Felling.

Tree Felling need to be used with caution and appropiate safety procedures. The Tree Felling procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

Tree Felling Safety Notes

Before Tree Felling:

  • A tree climber must be attached to the tree.
  • A ground worker must be in attendance.
  • Ladders must conform to the applicable provisions of AS 1892.
  • Equipment should be attached so no damage will be caused to the rope.
  • Timber under tention must be considered hazardous.

References:

NSW-     Occupational Health and Safety Act 2000
                Occupational Health and Safety Regulation 2001
               WorkCover- Safe Working at Heights guide 2006

QLD-      Workplace Health and Safety Act 1995 (Reprinted 1/1/08)
                Workplace Health and Safety Regulation (Reprinted 1/2/08)
               
ACT-       Occupational Health and Safety Act 1989

TAS-     Workplace Health and Safety Act 1995
             Workplace Health and Safety Regulation 1998

NT-         Workplace Health and Safety Act 2007
             Workplace Health and Safety Regulation 2008

SA-         Occupational Health, Safety and Welfare Act 1986
                Occupational Health Safety and Welfare Regulation 1995

WA-        Occupational Safety and Health Act 1984

SafetyCulture- Chainsaw Safe Work Procedure
SafetyCulture- Ladders Safe Work Procedure

 

 



OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012