The Safety Procedure includes:
- Specific Risks
- Planning & Pre-Start Checks
- Use of Trench Sheilds
- Use of Trench Ladder
- Operating
- Site Safety
- Completion
- Risk Ratings
- 4 Page Complete Procedure
- MS Word Format
- This Is Not A Blank Template
- Version 4.0
|
General Trench Work Safety Information:
The dangers of Trench Work have been highlighted by a number of workplace accidents. This four page Safe Work Procedure or Work Method Satement provides a safety framework for anyone working in trenches.
Trenches need to be used with caution and appropriate safety procedures. The Trench Work procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
Trench Work Safety Notes
When Working in a Trench:
- Slinging and movement of loads above workers will be prohibited.
- A secure cover is to be placed over the excavation after hours.
- On completion ensure the site is left in a tidy condition.
- Trench supports are required if seams, fissures, crevices, faults and mixed soil types are present.
|