The Safety Procedure includes:
- Driver Safety
- Risk Assessment
- Planning
- Loading (Forklift/WinchGeneral)
- Removal of Part Load
- Reversing
- Risk Ratings
- 5 Page Complete Procedure
- MS Word Format
- This Is Not A Blank Template
- Version 4.0
|
General Trucks - Loading & Unloading Safety Information:
The loading and unloading of trucks has caused thousands of injuries across Australia and New Zealand.
Truck Loading and Unloading operation can be performed safely when correct procedures are used. The Loading & Unloading of Trucks Procedure is a five page safety procedure that includes:
Truck Loading/Unloading Safety Information
General Operation
- The driver must stay out of harms way at all times while loading/unloading is taking place.
- Traffic movements should be understood and complied with.
- Suitable access must be provided to tray of trucks. (Steps, grab handles etc.)
- The tray should be clear of all loose objects.
- Ensure the forklift driver has a clear view of truck driver at all times.
|