Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
OHS Systems Work Method
Statements
Safety
Training
OHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Earth Moving >> Locating Sub-Soil Cabling (Non Evasive) Work Method Statement
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Engineering
1
1 Concrete Safety
1
Earth Moving
Auger Operation
1
Backhoe or Front End Loader
1
Battery Charging
1
1 1 Bob Cat & Skid Steer
1
1 1 Chain Trencher
1
Demolition Work
1
1 1 Dozer Operations
1
1
1 1 Earth Moving Equipment Maintenance
1
1 1 Fuel Storage, Handling and Decanting
1
1 1 Grader
1
1 1 Heat Stress
1
1 1 Hitching Mobile Plant
1
1 1 Incident Report Form
1
1 1 Jack Hammer
1
1 1 Job Safety Analysis Worksheet
1
1 1 Large Excavators
1
1 1 Lock-Out Of Plant And Equipment
1
1 1 Manual Handling
1
1 1 Mini Excavators
1
1 1 Motor Grader Operation
1
1 1 Post Hole Digger
1
1 1 Pressure Cleaner
1
1 1 Ride On Drum Roller
1
1 1 Scraper
1
1 1 Tipping Trucks
1
1 1 Traffic Management Plan
1
1 1 Trench Work
1
1 1 Underground Cable Locating
1
1 1 Vehicle Accident Procedure
1
1 1 Wacker Packer
1
1 1 Water Truck
1
1 1 Working Around Electricity
1
1 1 Complete WMS List
1
1 Industrial Safety
1
1 Electricians
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food And Kitchen Safety
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Locating Sub-Soil Cabling (Non Evasive) Work Method Statement or Safe Work Procedure


d

Underground Cable Locating SWMS
Buy Now

 

The Safety Procedure includes:

  • Site Risks
  • Employee/Contractor Requirements
  • Planning
  • Signage
  • Hazards, Pits & Man Holes etc..
  • Performing the Task
  • Completion
  • Risk Ratings
  • 4 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

 

 

General Sub Soil Cabling Safety Information:

Locating Sub Soil Cabling or underground cables requires a suitable Safe Work Procedure for employees and contractors to follow when locating cables. Without a proper process, electrical cables and utility services can be disrupted accidently.

This four page Safe Work Procedure or Work Method Statement has been developed for employers to be able to give direct instructions on how to locate underground cables safely. The document can be used as part of a Safety Induction or simply implemented into an existing OHS System.

Referenced from:

  • Victoria - Road Management Act 2004 - Worksite Safety – Traffic Management - Code of Practice
  • Queensland – Manual of Uniform Traffic Control Devices – Part 3
  • Queensland – Information paper - Sun Safety and Heat Stress.
  • Australian Standard – AS1742.3 Traffic Control Devices for Works on Roads

Reference:

 

 

Victoria - Road Management Act 2004 - Worksite Safety – Traffic Management - Code of Practice
QueenslandManual of Uniform Traffic Control Devices – Part 3
Queensland Information paper - Sun Safety and Heat Stress.
Australian Standard – AS1742.3 Traffic Control Devices for Works on Roads

 

 

   

Product Updates: First Name * Last Name * Email *

OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES