Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Earth Moving >> Vehicle Accident Work Method Statement
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Engineering
1
1 Concrete Safety
1
Earth Moving
Auger Operation
1
Backhoe or Front End Loader
1
Battery Charging
1
1 1 Bob Cat & Skid Steer
1
1 1 Chain Trencher
1
Demolition Work
1
Directional Drilling - Horizontal
1
1 1 Dozer Operations
1
1
1 1 Earth Moving Equipment Maintenance
1
1 1 Excavator Auger Attachment
1
1 1 Excavator - Large
1
1 1 Excavator - Mini
1
1 1 Fuel Storage, Handling and Decanting
1
1 1 Grader
1
1 1 Heat Stress
1
1 1 Hitching Mobile Plant
1
1 1 Hydro-Excavation Truck
1
1 1 Incident Report Form
1
1 1 Jack Hammer
1
1 1 Job Safety Analysis Worksheet
1
1 1 Large Excavators
1
1 1 Lock-Out Of Plant And Equipment
1
1 1 Manual Handling
1
1 1 Mini Excavators
1
1 1 Motor Grader Operation
1
1 1 Post Hole Digger
1
1 1 Pressure Cleaner
1
1 1 Ride On Drum Roller
1
1 1 Scraper
1
1 1 Stabiliser RM300 and RM500
1
1 1 Tipping Trucks
1
1 1 Traffic Management Plan
1
1 1 Trench Work
1
1 1 Truck and Dog
1
1 1 Underground Cable Locating
1
1 1 Vehicle Accident Procedure
1
1 1 Wacker Packer
1
1 1 Water Truck
1
1 1 Working Around Electricity
1
1 1 Complete WMS List
1
1 Industrial Safety
1
1 Electricians
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food And Kitchen Safety
Cleaning Industry
Handyman
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Vehicle Accident Work Method Statement or Safe Work Procedure

Vehicle Accident
Vehicle Accident SWMS
Buy Now

 

The Safety Procedure includes:

  • Immediate Response
  • Police
  • Advise Management
  • Insurance
  • Signing Documents
  • Exchanging Details
  • Photograph
  • Vehicle Recovery
  • Risk Ratings
  • 4 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

 

 

General Vehicle Accident Safety Information:

The two page Safe Work Procedure outlines the Safety Steps required when there is a Vehicle Accident.

Vehicle Accidents need to be approached with caution and appropriate safety procedures. The Vehicle Accident procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

Vehicle Accident Notes

When in a Vehicle Accident:

  • Activate hazard lights (if they're still working).
  • Ensure the risk of fire, or any other damages is minimised.
  • Notify police if anyone is injured and/or a vehicle has to be towed.
  • Ensure the accident scene is safe.
  • Exchange details with the individuals involved. (I.E. Full Name, License Details, Rego Details etc.)


OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012