The Water Truck Safety Procedure includes:
- Personnel - Competent People
- Risk Assessment
- Fuelling Truck and Auxilliary Motor
- Daily Pre-Start Checks - Truck
- Truck Operation
- Site Safety - Dust Control Spraying
- Road Side Safety - Obtaining Water From Hydrant
- Risk Ratings
- 9 Page Complete Procedure
- MS Word Format
- This Is Not A Blank Template
- Version 4.0
|
General Water Truck Safety Information:
Water Truck injuries can be prevented through correct training and by adopting Safe Handling Procedures.
The nine page Safe Work Procedure or Work Method Statement is a vital part of a safe work system.
The Water Truck Procedure is This Is Not A Blank Template and are not blank templates. Safety Procedures can be edited or customised in MS Word if required.
Before Operating A Water Truck :
- Ensure all personnel has a suitable truck license before operating vehicle.
- The controller of the worksite is to perform the risk assessment tests.
- Ensure that all motors within the area are turned off before re-fuelling.
- Ensure that there is adequate ventilation and the vehicle is in a spark free environment
- Before starting the motor, ensure transmission is in neutral and check the throttle for proper operation.
- Undertake site safety induction with job supervisor.
|