|
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Pre-use inspection
- Set-up of EWP
- Set-up of ladders
- Operation
- Emergency Procedures
Product Details:
- 12 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
-
Instant download delivery
|
Window Cleaning - Pole & Detergent Information:
The Window Cleaning using extending Pole & Detergent Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure outlining the safety steps for Window Cleaning using extending Pole & Detergent. This SWMS does NOT include abseiling and rope access equipment for high rise window cleaning.
The Window Cleaning using extending Pole & Detergent procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Window Cleaning using extending Pole & Detergent procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
Planning
For a fall risk 2m or above, conduct risk assessment to determine suitable work at height equipment. Consider:
- Type and duration of task
- Ground condition
- Expected work height
- Physical surroundings
- Operator experience
- Safe working loads
- Whether type of work may impact load capacity or stability (Example: using extended poles)
- Proximity to work area (over-reach)
- Stable surface to rest ladders upon and tie-down
- Contact with Elevated Work Platform (EWP) or ladder (pedestrian or vehicle)
- Live electrical work in close proximity (only non-conductive ladders/ insulated EWP)
- Lighting
- Weather conditions (high winds, rain)
- Catchment equipment (such as tool lanyard) to ensure tool/equipment cannot fall from heights
- Licenses and training required for use of EWP, scaffold erection etc.
- Traffic Management and Site access restrictions
- Visibility (sun glare, nearby processes/persons working at ground level, window awnings etc)
- Ensure workers are not fatigued or under influence of drugs/alcohol.
Develop a site specific SWMS for task and equipment as required
|