Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Electricity- (working around)
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Electricity- (working around) Work Method Statement

Electricity- (working around) Safe Work Method Statement
Example SWMS
Buy Now

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Personnel
  • Preparation
  • Inspection Schedule
  • Pre-Inspection
  • Operation of Equipment
  • Maintenance, Repairs & Cleaning
  • Emergency Response
  • References

Product Details:

  • 12 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related Items:

Electricity- (working around) Information:

The Electricity- (working around) Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure. This SWMS is directed at employees who work around live electrical sources or equipment in all industries and does not include safe work procedures for qualified persons working with electricity.

The Electricity- (working around) procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Electricity- (working around) Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

Preparation

Inspect workplace.

Ensure:

  • safety switches/Residual Currents Devices (RCD) are provided where possible
  • extension leads kept off ground/travel paths
  • extension leads are not wrapped around metal surfaces (eg: hung from suspended ceiling beams)
  • extension leads are not used for permanent power supply
  • machinery is hard wired and earthed as required
  • fire protection equipment is provided
  • signage is attached to switchboards
  • switchboards are covered and kept locked
  • all equipment control panels (containing exposed wires/fuses) are covered and kept locked
  • a lock out/tag out procedure is in place
  • equipment is suitable for purpose (eg: external environment, water protection, explosion proof in hazardous zones)
  • sufficient outlets are provided to avoid piggy-backing and use of power boards
  • where power boards are used, overload protection is provided
  • flammables are not stored in close proximity to GPO (General Purpose Outlets)



OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012