Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Earth Moving >> Working On Roofs Work Method Statement
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Engineering
1
1 Concrete Safety
1
Earth Moving
Auger Operation
1
Backhoe or Front End Loader
1
Battery Charging
1
1 1 Bob Cat & Skid Steer
1
1 1 Chain Trencher
1
Demolition Work
1
1 1 Dozer Operations
1
1
1 1 Earth Moving Equipment Maintenance
1
1 1 Excavator Auger Attachment
1
1 1 Excavator - Large
1
1 1 Excavator - Mini
1
1 1 Fuel Storage, Handling and Decanting
1
1 1 Grader
1
1 1 Heat Stress
1
1 1 Hitching Mobile Plant
1
1 1 Incident Report Form
1
1 1 Jack Hammer
1
1 1 Job Safety Analysis Worksheet
1
1 1 Large Excavators
1
1 1 Lock-Out Of Plant And Equipment
1
1 1 Manual Handling
1
1 1 Mini Excavators
1
1 1 Motor Grader Operation
1
1 1 Post Hole Digger
1
1 1 Pressure Cleaner
1
1 1 Ride On Drum Roller
1
1 1 Scraper
1
1 1 Stabiliser RM300 and RM500
1
1 1 Tipping Trucks
1
1 1 Traffic Management Plan
1
1 1 Trench Work
1
1 1 Underground Cable Locating
1
1 1 Vehicle Accident Procedure
1
1 1 Wacker Packer
1
1 1 Water Truck
1
1 1 Working Around Electricity
1
1 1 Complete WMS List
1
1 Industrial Safety
1
1 Electricians
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food And Kitchen Safety
Cleaning Industry
Handyman
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Working On Roofs Work Method Statement or Safe Work Procedure


Roof_Safety

Working On Roofs SWMS
Buy Now

 

The Safety Procedure includes:

  • Personal Protective Equipment
  • Roof Identification
  • Fall Rescue Procedures
  • Warning Signs
  • Brittle Roofs
  • Crane Placement
  • Locating Cables & Tiger Tails
  • Fall Arrest Scaffolding
  • Mobile Scaffolding
  • Ladder Access
  • Using Electric Tools
  • Manual Handling On Roofs
  • Site Safety
  • Removing Waste From Roofs
  • Risk Ratings
  • 5 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

 

 

General Working On Roofs Safety Information:

Working On Roofs need to be approached with caution and appropriate safety procedures.

The Working On Roofs Safe Work Procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

Working On Roofs Safety Notes

Before Commencing Work On Roofs:

You must assume that the roof is brittle or fragile unless it has been positively confirmed as being metal sheeted and in sound condition.

Identify:

  • all tasks that could involve someone falling – Example – working within 3 metres of the roof edge.
  • any objects that could fall onto someone
  • possible adverse climate conditions – Example rain or heavy dew.
  • risks to other workers on site such as– objects that could fall onto others.

 


References:

 

 

QueenslandWorkplace Health and Safety Regulations 1997
Queensland - Scaffolding Advisory Standard 2004
New South WalesCode of Practice – Safe Work on Roofs.
Workcover Tasmania – Managing the Risk of Falling in Housing Construction – Code of Practice
Workcover Tasmania – Working at Heights – Guide to Reducing the Risk of Injury
NOHSC - National Standard for Construction Work -:1016 (2005)
Worksafe Victoria - Prevention of Falls - Working on Roofs – Fact Sheet (2005)
Australian Standard 2626 – Industrial safety belts and harnesses – Selection, use and maintenance Safety Culture – Safe Work Procedure – Safety Harnesses
Safety Culture – Safe Work Procedure – Ladders – Safe Use of


 



OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012