|
Develop and implement an emergency response plan for the site.
Includes:
- assembly points
- communication
- responsible persons
- emergency contacts (including nearest medical facility)
- fire fighting plans
For larger fire outbreaks – call 000
Related Items: Manual Handling
|
Borehole Drilling Samples Information:
The Borehole- Drilling Samples Safe Work Method Statement (SWMS) is a comprehensive 13 page procedure outlining the steps for safely drilling samples.
This SWMS covers general safety issues with borehole drilling and sample drilling using a drill rig/auger mounted to vehicle.
The Borehole- Drilling Samples procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Borehole- Drilling Samples Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
|