The Safety Procedure includes:
- Operators Requirements
- New Operator Induction
- Site Awareness
- Pre-Start Checks
- Preparation
- Operation
- On Completion
- General Maintenance
- Risk Ratings
Product Details:
- 13 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
|
General Air Compressor Safety Information:
The Brake Press Safe Work Method Statement (SWMS) is a comprehensive 13 page procedure outlining the safety steps for use of a Brake Press.
The Brake Press procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Brake Press procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
Brake Press Safety Notes
Before Operating A Brake Press:
- Check all guards to ensure they are operating and in place.
- Check emergency stop switches are working.
- Ensure heavy items are supported.
- Ensure foot pedal is placed out of the way of material to be bent.
- Keep hands well clear of blade area.
|