Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
OHS Systems Work Method
Statements
Safety
Training
OHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Industrial Safety >> Brake Press Work Method Statement
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Concrete Safety
1
1 Earth Moving
1
1 Electricians
1
1 Engineering
1
Industrial Safety
1
1 1 Air Compressor (Portable)
.
. . Battery Charging
1 1 Brake Press
1
1 1 Cleaning Stainless Steel Weld with pickling gel
1
1 1 Cut off metal saw
1
1 1 DIY Audit Kit
1
1 1 Drill Press
1
1 1 Dust Extractor
1
1 1 Forklift Petrol/Diesel Safety
1
1 1 Forklift Maintenance
1
1 1 Guillotine Use
1
1 1 Grinder (Freehand)
1
1 1 Hydraulic Press
1
1 1 Incident Report
1
1 1 Job Safety Analysis Worksheet
1
1 1 Linisher
1
1 1 LPG Work Method Statement (Liquid Propane Gas)
1
1 1 Manual Handling (Lifting)
1
1 1 Metal turning Lathe
1
1 1 Operating Power Tools
1
1 1 Oxy Acetylene
1
1 1 Pedestal Drill
1
1 1 Permit To Work
1
1 1 Pipe Bender
1
1 1 Plasma Cutter
1
1 1 Powder coating
1
1 1 Pressure Cleaner
1
1 1 Servicing Engines
1
1 1 Sheet Metal Roller
1
1 1 Steel Construction
1
1 1 Trucks (Loading/Unloading)
1
1 1 Welder (Electric)
1
1 1 Welder Mig
1
1 1 Welder Tig
1
1 1 Working Around Electricity
1
1 1 Complete WMS List
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Welding Industry
1
1 Welding Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food and Kitchen Safety
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Brake Press Safe Work Procedure or Work Method Statement


Brake Press SWMS
Buy Now

 

The Safety Procedure includes:

  • Operators Requirements
  • New Operator Induction
  • Site Awareness
  • Pre-Start Checks
  • Preparation
  • Operation
  • On Completion
  • General Maintenance
  • Risk Ratings
  • MS Word Format
  • This Is Not A Blank Template
  • Multiple page document
  • Delivered via email within 2 business hours

 

 

General Air Compressor Safety Information:

Brake Presses need to be used with caution and appropriate safety procedures.

The Brake Press procedure is Not A Blank Template. Safety Procedures can be edited or customised in MS Word if required.

Brake Press Safety Notes

Before Operating A Brake Press:

  • Check all guards to ensure they are operating and in place.
  • Check emergency stop switches are working.
  • Ensure heavy items are supported.
  • Ensure foot pedal is placed out of the way of material to be bent.
  • Keep hands well clear of blade area.

References:

 

 

Queensland – Department of Industrial Relations - Manufacturing Industry - Sprains and strains prevention fact sheet.
Queensland – Guide to safeguarding common machinery and plant.
New South Wales – WorkCover – Safe operating Procedure – Brake Press (Sample).
South Australia – SafeWork - Metal Fabrication Industry - Machine Guarding Brochure.
SAI Global – AS/NZS 1219-1994 Power Presses – Safety Requirements.
SAI Global - AS4024.1-2006 Safety of machinery.
United States Department of Labor - Occupational Safety & Health Administration - OSHA - Regulations (Standards - 29 CFR) - Mechanical power presses. - 1910.217.

 



Product Updates: First Name * Last Name * Email *

OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES