|
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Operation
- First Aid/Emergency Procedures
- References
Product Details:
- 12 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
First Aid/Emergency Response
Chemicals
Inhalation:
- Remove person into a well ventilated area
- Remove any contaminated clothing
Skin contact:
- Wash with large volume of water
- If blistering, redness or irritation occurs – seek medical attention
Eye Contact:
- Flush eye with water for at least 15 minutes
Ingestion:
- Do not induce vomiting
- Provide water and seek medical attention
|
Cleaning Without Adequate Ventilation Information:
The Cleaning in cramped areas without adequate ventilation Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure.
This SWMS is intended for cleaners working in cramped work areas where ventilation is limited. This does NOT include cleaning in “Confined Spaces” as defined in relevant OHS legislation. For cleaning in Confined Spaces, a Confined Space SWMS must be used in conjunction with a Confined Space Entry Permit system.
The Cleaning without adequate ventilation procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Cleaning without adequate ventilation procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
|