The Safety Procedure includes:
- Site Awareness
- Suitable Location
- Boom Set-Up
- Delivery Pipeline Set-Up
- Pre-Start Daily Checks
- Concrete Delivery
- Pumping
- On Completion
- Risk Ratings
Product Details:
- 11 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Related Items:Concrete Formwork, Concrete Preparation and Laying
|
General Concrete Pumping Safety Information:
The Concrete Pump with Truck Mounted Placing Boom Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure outlining the safety steps for the safe delivery of Concrete via Pumping with Truck Mounted Placing Boom.
The Concrete Pump with Truck Mounted Placing Boom procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Concrete Pump with Truck Mounted Placing Boom Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
Concrete Pumping Safety Notes
When Concrete Pumping:
- Isolate the concrete truck and pump zone with fencing or other barriers.
- If working in the street, comply with local by-laws.
- Check all individual components for wear and possible damage.
- Check each vertical bend is fixed to stop movement of the bend.
- Pumping equipment must be in a mechanically sound condition
|