Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
OHS Systems Work Method
Statements
Safety
Training
OHS AuditsSafety ShopOHS News
nav spacer
Work Method Statements
Work Method Statements spacer
Safety Culture >> Work Method Statements >> Concrete Safety >> Concrete Pumping With Truck Mounted Placing Boom Work Method Statement
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commerical Construction Industry
1
1 Construction Site Safety Management Plans
1
Concrete Safety
1 1 Circular Saw (Handheld)
1
1 1 Cement Mixer
1
1 1 Concrete Crusher
1
1 1 Concrete Joining, Sealing & Curing
1
1 1 Concrete Preperation and Laying
1
1 1 Concrete Form Work
1
1 1 Concrete Helicopter
1
1 1 Concrete Pumping
1
1 1 Concrete Rendering
1
1 1 Concrete Sawing
1
1 1 Concrete Vibrator
1
1 1 Cut-off Metal Saw
1
1 1 Dust Extractor
1
1 1 Fuel Storage, Handling and Decanting
1
1 1 Grinder (Freehand)
1
1 1 Heights (Working at)
1
1 1 Incident Report Form
1
1 1 Heat Stress
1
1 1 Jack Hammer
1
1 1 Job Safety Analysis Worksheet
1
1 1 Manual Handling (Lifting)
1
1 1 Power Tools (Operation)
1
1 1 Scaffolding
1
1 1 Tilt-up Precast Concrete Panels
1
1 1 Traffic Management and Roadside Construction Guidelines
1
1 1 Tying Rebar by Machine or Manually
1
1 1 Wacker Packer
1
1 1 Complete WMS List
1
1 Earth Moving
1
1 Electricians
1
1 Industrial Safety
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Engineering
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food And Kitchen Safety
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Concrete Pumping With Truck Mounted Placing Boom Work Method Statement or Safe Work Procedure

Concrete Pumping
Concrete Pumping SWMS
Buy Now

 

The Safety Procedure includes:

  • Site Awareness
  • Suitable Location
  • Boom Set-Up
  • Delivery Pipeline Set-Up
  • Pre-Start Daily Checks
  • Concrete Delivery
  • Pumping
  • On Completion
  • Risk Ratings
  • 8 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

 

 

General Concrete Pumping Safety Information:

The eight page Safe Work Method Statement outlines the Safety Steps required to operate a Concrete Pump with Truck Mounted Placing Boom Safely.

Concrete Pumping needs to be used with caution and appropiate safety procedures. The Concrete Pumping procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

Concrete Pumping Safety Notes

When Concrete Pumping:

  • Isolate the concrete truck and pump zone with fencing or other barriers.
  • If working in the street, comply with local by-laws.
  • Check all individual components for wear and possible damage.
  • Check each vertical bend is fixed to stop movement of the bend.
  • Pumping equipment must be in a mechanically sound condition

References:

 

 

New South - Wales WorkCover – Concrete Pumping – Code of practice 1994
Queensland – Department of Industrial Relations – Concrete Pumping – Code of Practice 2005
Victoria – Worksafe - Concrete Pumping Industry Standard – 2004
Victorian WorkCover -Concrete trucks reversing to discharge into a pump – Guidance Note 2005
Australian Standard 2550.15 - Cranes—Safe use - Concrete Placing equipment

 



Product Updates: First Name * Last Name * Email *

OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES