The Core Drilling Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Pre-operational Inspection
- Operation
- Completion
- Maintenance
- Emergency Procedures & First Aid
Product Details:
- 10 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Hazards Associated with Drilling
Dust created by cutting has the potential to cause harm to health through respiratory exposure. Dust generated during drilling activities could contain crystalline silica which can lead to silicosis. It is critical that dust suppression (use of water / coolant) or dust extraction principles are implemented to avoid the inhalation of silica dust. It is recommended that respirators also be used where there is still a risk of inhalation. Care must be taken to protect other persons who may be exposed to any dust within the vicinity.
Working with electrical equipment and water requires vigilance in the integrity of equipment and safe set up of the work area.
Serious injury can be sustained with improper use of Core Drilling Units. Competent operators and strict adherence to safe work procedure is critical.
|
General Core Drilling Safety Procedure information:
The Core Drilling Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure outlining the safety steps for use of a Bench Grinder.
The Core Drilling procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Core Drilling procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
|