|
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Travel to collection site
- Collection of Kerbside rubbish
- Unloading
- Clean up & Maintenance
- Emergency Procedures
- References
Product Details:
- 10 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Unloading
Follow traffic management at landfill site
Park in designated area. Ensure ground is flat/solid.
Unloading
- Do not stand near edge of tray or on truck body
- Do not unload in high winds
- Ensure adequate space above and behind vehicle for tailgate operation or truck body lift.
- Clear persons from area.
- For hand unloading – check load is stable, decide appropriate unloading sequence, use lifting equipment/aids, team-lifting and work from ground wherever possible.
|
Kerbside Rubbish Removal Information:
The Kerbside Rubbish Removal Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure.
This SWMS covers Kerbside Collection of residential hard waste. It does not cover the collection of construction waste, biological or hazardous waste. This SWMS does not cover trucks fitted with a compactor.
The Kerbside Rubbish Removal Work Method Statement is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Kerbside Rubbish Removal Work Method Statement is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
|