Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Commercial Construction >> Dust Extractor Work Method Statement
Work Method Statements spacer
1 Residential Construction Procedures
1
Construction Site Safety Management Plan
1
Commercial Construction Industry
Air Compressor (Portable)
Antenna and Satellite Installation
Asbestos Removal - Friable
Asbestos Removal - Non Friable
1
1 1 Auger
Backhoe or Front End Loader
1
1 1 Boom Lift
Brick Laying
Brick Saw
Carpet Laying
1
1 1 Cement Render
1
1 1 Circular Saw
1
1 1 Cherry Picker
1
1 1 Cleaning Up Building Sites
1
1 1 Concrete Joining, Sealing & Curing
1
1 1 Concrete Preperation and Laying
1
1 1 Concrete Helicopter
1
1 1 Concrete Pumping
1
1 1 Concrete Sawing
1
1 1 Concrete Truck
1
1 1 Concrete Vibrator
1
1 1 Confined Spaces
1
1 1 Cornice Fixing
1
1 1 Dealing with the Public - Construction
1
1 1 Demolition Work
1
1 1 Docking Saw
1
1 1 Dust Extractor
1
1 1 Electrical Wiring
1
1 1 Epoxy Grout Application
1
1 1 Fuel Storage, Handling, And Decanting
1
1 1 Grinder (Freehand)
1
1 1 Handrail Installation
1
1 1 Heat Stress
1
1 1 Heights (Safe Working At)
1
1 1 Hitching Mobile Plant To Vehicle
1
1 1 Hiab Crane or Truck Loading Crane
1
1 1 Hot Works
1
1 1 Incident Report Form
1
1 1 Installing Roof Insulation (Batts)
1
1 1 Jack Hammer
1
1 1 Job Safety Analysis
1
1 1 Ladders
1
1 1 Large Excavators
1
1 1 Loading Docks
1
1 1 Lock-Out of Plant and Equipment
1
1 1 Manual Handling (Lifting)
1
1 1 Mini Excavators
1
1 1 Overhead Crane
1
1 1 Oxy Acetylene
1
1 1 Partitioning - Steel, Stud and Track
1
1 1 Paving
1
1 1 Pedestal Drill
1
1 1 Permit To Work
1
1 1 Pipe Laying (Coiled Pipe)
1
1 1 Plasterboard Fixing
1
1 1 Plasterboard Setting
1
1 1 Plasterer Stilts
1
1 1 Polyethylene Pipe Butt Welder
1
1 1 Post Hole Digger
1
1 1 Power Tools (Operation)
1
1 1 Pressure Cleaner - electric
1
1 1 Pressure Cleaner - petrol
1
1 1 Stabiliser RM300 and RM500
1
1 1 Roofs (Working On)
1
1 1 Rubbish Removal
1
1 1 Safety Harnesses
1
1 1 Sand Blasting
1
1 1 Scaffolding
1
1 1 Scaffolding- BetaGuard Mobile Tower
1
1 1 Scissor Lift
1
1 1 Support Vehicle - Earthmoving
1
1 1 Steel Construction
1
1 1 Tilt Up Pre-Cast Concrete Panels
1
1 1 Timber Framework
1
1 1 Trench Work
1
1 1 Trestles
1
1 1 Trucks (Loading/Unloading)
1
1 1 Tying Rebar
1
1 1 Underground Cable Locating
1
1 1 Vehicle Accident Procedure
1
1 1 Wacker Packer
1
1 1 Waterproofing Bathrooms and Laundries
1
1 1 Welder (Electric)
1
1 1 Working Around Electricity
1
1 1 Construction Site Management
1
1 1 Complete WMS List
1
1 Concrete Safety
1
1 Engineering
1
1 Welding
1
1 Earth Moving
1
1 Industrial Safety
1
1 Electricians
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food and Kitchen Safety
Cleaning Industry
Handyman
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Dust Extractor Work Method Statement or Safe Work Procedure


Dust Extractor

Dust Extractor SWMS
Buy Now

 

The Safety Procedure includes:

  • Risk Assessment
  • Operators Requirements
  • Site Awareness
  • Operation
  • Emergency Procedures
  • Risk Ratings
  • MS Word Format
  • Delivered via email within 2 business hours
  • Multiple page procedure

 

 

General Dust Extractor Safety Information:

The Safe Work Method Statement outlines the Safety Steps required to operate a Dust Extractor Safely.

Dust Extractors need to be used with caution and appropriate safety procedures. The Dust Extractor procedure is Not A Blank Template. Safety Procedures can be edited or customised in MS Word if required.

Dust Extractor Safety Notes

Before Operating A Dust Extractor:

  • No person shall service the dust extractor, unless trained to do so.
  • Some dry timbers can self-ignite.
  • Have a Class A fire extinguisher on standby.
  • Do not eat, drink or smoke around the equipment.
  • Lock-Off the extraction equipment.
  • If conditions are unsafe, evacuate to at least 50 meters.

References:

 

 

Victoria - Occupational Health and Safety Act 2004
Victoria - Occupational Health and Safety Regulations 2007
Victorian WorkCover Authority - Guidance Note - Wood dust - Health hazards and control
Australian / New Zealand Standard AS/NZS 1715:1994 - Selection, use and maintenance of respiratory protective devices
United Kingdom - Control of Substances Hazardous to Health Regulations (COSHH) - Control guidance sheet 204 - Removing waste from a dust extraction unit

 




OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012