Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
OHS Systems Work Method
Statements
Safety
Training
OHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Industrial Safety >> Dust Extractor Work Method Statement
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Concrete Safety
1
1 Earth Moving
1
1 Electricians
1
1 Engineering
1
Industrial Safety
1
1 1 Air Compressor (Portable)
.
. . Battery Charging
1 1 Brake Press
1
1 1 Cleaning Stainless Steel Weld with pickling gel
1
1 1 Cut off metal saw
1
1 1 DIY Audit Kit
1
1 1 Drill Press
1
1 1 Dust Extractor
1
1 1 Forklift Petrol/Diesel Safety
1
1 1 Forklift Maintenance
1
1 1 Guillotine Use
1
1 1 Grinder (Freehand)
1
1 1 Hydraulic Press
1
1 1 Incident Report
1
1 1 Job Safety Analysis Worksheet
1
1 1 Linisher
1
1 1 LPG Work Method Statement (Liquid Propane Gas)
1
1 1 Manual Handling (Lifting)
1
1 1 Metal turning Lathe
1
1 1 Operating Power Tools
1
1 1 Oxy Acetylene
1
1 1 Pedestal Drill
1
1 1 Permit To Work
1
1 1 Pipe Bender
1
1 1 Plasma Cutter
1
1 1 Powder coating
1
1 1 Pressure Cleaner
1
1 1 Servicing Engines
1
1 1 Sheet Metal Roller
1
1 1 Steel Construction
1
1 1 Trucks (Loading/Unloading)
1
1 1 Welder (Electric)
1
1 1 Welder Mig
1
1 1 Welder Tig
1
1 1 Working Around Electricity
1
1 1 Complete WMS List
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Welding Industry
1
1 Welding Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food and Kitchen Safety
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Dust Extractor Work Method Statement or Safe Work Procedure


Dust Extractor

Dust Extractor SWMS
Buy Now

 

The Safety Procedure includes:

  • Risk Assessment
  • Operators Requirements
  • Site Awareness
  • Operation
  • Emergency Procedures
  • Risk Ratings
  • MS Word Format
  • Delivered via email within 2 business hours
  • Multiple page procedure

 

 

General Dust Extractor Safety Information:

The Safe Work Method Statement outlines the Safety Steps required to operate a Dust Extractor Safely.

Dust Extractors need to be used with caution and appropriate safety procedures. The Dust Extractor procedure is Not A Blank Template. Safety Procedures can be edited or customised in MS Word if required.

Dust Extractor Safety Notes

Before Operating A Dust Extractor:

  • No person shall service the dust extractor, unless trained to do so.
  • Some dry timbers can self-ignite.
  • Have a Class A fire extinguisher on standby.
  • Do not eat, drink or smoke around the equipment.
  • Lock-Off the extraction equipment.
  • If conditions are unsafe, evacuate to at least 50 meters.

References:

 

 

Victoria - Occupational Health and Safety Act 2004
Victoria - Occupational Health and Safety Regulations 2007
Victorian WorkCover Authority - Guidance Note - Wood dust - Health hazards and control
Australian / New Zealand Standard AS/NZS 1715:1994 - Selection, use and maintenance of respiratory protective devices
United Kingdom - Control of Substances Hazardous to Health Regulations (COSHH) - Control guidance sheet 204 - Removing waste from a dust extraction unit

 



Product Updates: First Name * Last Name * Email *

OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES