Preparation
Ensure MSDS is available at work site and all employees/ persons read, understand and know where to find them.
Provide adequate lighting if required.
Provide as much ventilation as possible. Open windows / doors. Use mechanical ventilation or correctly positioned portable fans.
Ensure PPE is supplied as prescribed in MSDS (example, PVC gloves, half or full face respirators with appropriate cartridge or supplied air, chemical goggles, aprons, gauntlet gloves, rubber boots (ensure pants are not tucked into boots in case of spill) etc).
Related Items: Manual Handling
|
Epoxy Grout Installation Information:
The Application of 3 Part Epoxy Grout Safe Work Method Statement (SWMS) is a comprehensive 7 page procedure outlining the safety steps for Application of 3 Part Epoxy Grout.
This SWMS is intended for using 3 Part Epoxy Grout in areas where ventilation is limited. This does NOT include "Confined Spaces” as defined in relevant OHS legislation. For working in Confined Spaces, a Confined Space SWMS must be used in conjunction with a Confined Space Entry Permit system.
The Application of 3 Part Epoxy Grout procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Application of 3 Part Epoxy Grout procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
References:
- OHS Legislation in all States
- WorkSafe Victoria – Code of Practice for Hazardous Substances
- Safe Work Australia – National Code of Practice for Storage and
- Handling of Dangerous Goods (2001)
- Safe Work Australia – National Code of Practice for the Control of
Workplace Hazardous Substances (2007)
- Safe Work Australia - National Code of Practice for the Prevention of
Musculoskeletal Disorders Caused From Performing Manual Tasks (2007)
- ARDEX Abapoxy Part A, Part B and Part C MSDS (as supplied)
|